A54 Project

  • Location: second Neighborhood
  • BEIT ALWATAN

UPDATES: 5/2025

Work is underway to paint the lower deck of the rear facade and the right and left sides, and the basement flooring is being leveled. The basement drainage grilles are being installed.

Lets get in touch

Have questions or comments? We would love to hear from you, get in touch and our expert support team will answer all your inquiries